3484848 – Understanding actual product cost calculation

Symptom

The Actual Product Cost is displayed in the Production Order window on the Summary tab. It represents the value of the received product quantity. The actual product cost is calculated as: Cost per component × Expected component quantity

The calculation of the expected component quantity is based on the value of completed products, which may be equal to or different from the value of the issued component quantity. If these two values differ, a production variance occurs. The expected component quantity is calculated as: Planned component quantity × (Actual product completed quantity / Planned product quantity)

Reproducing the Issue

You need to understand how product cost is calculated in different scenarios. This document provides three example scenarios for different valuation methods.

Resolution

Scenario 1 – No component quantity was issued:

  1. Production order contains:
    Component item ‘C1’,  planned quantity: 10, manual issue method,
    Product item ‘P1’, planned quantity: 4.
  2. Add a receipt from production with a quantity of 1.

The system will first calculate the expected component quantity as 2.5 for component ‘C1’.
It is calculated as: Planned component quantity × (Actual parent completed quantity / Planned parent quantity) = 10 × (1 / 4) = 2.5

Based on the component valuation method, the actual product cost is calculated as follows:

actual product cost calculation pic 1

Scenario 2 – Sufficient component quantity was issued:

If the user issued a sufficient amount or more component quantity than the expected component quantity, the system will determine the value of the components that were issued but not applied to previously received products.
Subsequently, this value will be used in the calculation of the product cost.

  1. Production order contains:
    Product item ‘P1’, planned quantity: 4
    Component item ‘C1’, planned quantity: 10, manual issue method
  2. Add an issue for production with a quantity of 6 for component ‘C1’.
  3. Add a receipt from production with a quantity of 2 for product ‘P1’.

The system will first calculate the required quantity of component ‘C1’ as 5: Planned component quantity × (Actual parent completed quantity / Planned parent quantity) = 10 × (2 / 4) = 5.
Regardless of the current component cost, the actual product cost is calculated using the actual cost of the already issued components.
Between the Issue for Production and the Receipt from Production documents, other transactions involving the component may have been recorded. As a result, the component cost at the time of issue may differ from the cost at the time of receipt.”

actual product cost calculation pic 2

Scenario 3 – insufficient component quantity was issued:

If the user issued a smaller quantity than the expected component quantity, the system will sum up the total issued component cost and the cost of the additional required component quantity.

  1. Production order contains:
    Product item ‘P1’, planned quantity: 4
    Component item ‘C1’, planned quantity: 10, manual issue method.
  2. Add an issue for production with a quantity of 3 for component ‘C1’.
  3. Add a receipt from production with a quantity of 2 for product ‘P1’.

The system will first calculate the expected component quantity as 5 of component ‘C1’: Planned component quantity × (Actual parent completed quantity / Planned parent quantity) = 10 × (2 / 4) = 5.
The actual product cost is calculated as follows, based on the component valuation method:

actual product cost calculation pic 3

In all of the above scenarios, if you issue additional components later while closing the production order, the actual product cost will be revalued based on the actual component cost.
This revaluation occurs only if the produced quantity is still available in the warehouse at the time of production order closure.

SAP Note 2962133 – Variance Calculation and Variance Report in Production Order – SAP for Me

Picture of Trần Văn Sơn

Trần Văn Sơn

Với 18+ năm kinh nghiệm và 50+ dự án thành công, tôi chuyên giải quyết bài toán quản trị từ gốc rễ quy trình và con người. Phương châm của tôi là hướng doanh nghiệp vận hành theo chuẩn SAP B1 toàn cầu, đảm bảo hệ thống vận hành đơn giản, hiệu quả ở hiện tại và dễ dàng nâng cấp, mở rộng trong tương lai.
Thảo luận và chia sẻ kinh nghiệm
Bạn có gặp tình huống tương tự khi sử dụng hệ thống SAP Business One?

Bài có liên quan theo chủ đề đang xem

3777838 – Enhanced “E-Mail” type activities

Symptom Here are the updates to the E-Mail type activities: New Send As options in E-Mail type activities and Send Message window New sending option of Microsoft Outlook New Activity of “Email” Type option in Sent Emails Report – Selection Criteria window Enhanced Emailed checkbox